Manly Council’s Andrew ‘Boy’ Charlton Aquatic Centre is a popular leisure centre in Sydney’s north. With indoor and outdoor heated pool facilities, including a Water Play area, this aquatic centre is a popular choice for families and swimming enthusiasts.
We were engaged to replace the aquatic centre’s outdated boiler system, as the existing boilers had reached the end of their service life. Simons Boilers managed every aspect of the retrofit boiler upgrade, from design though to installation and commissioning. This includes the removal of the outdated system, and the installation of FTB 800kW hot water boilers to better support the centre’s operational requirements.
The new firetube boiler system supplies hot water to heat the indoor and outdoor pools, while also providing heating for the aquatic centre itself. Each element of the new system was designed to ensure consistent performance, supporting the aquatic centre year-round.
Our team engineer custom steam and hot water solutions for commercial and industrial applications across Australia. Call us today to enquire about how Simons Boilers can support your next project.




